University Hospital Monklands

Project Overview
We are investing £8.6 million in our wastewater network, replacing more than 650 metres of pipework across six locations in Glasgow and Lanarkshire.
The project will deliver benefits for the environment and existing customers across various communities by reducing the risk of sewer flooding.
It is also a key part of enabling works to support future development of the new University Hospital Monklands site in Wester Moffat, Airdrie.
Six locations across Airdrie, Coatbridge, Bargeddie and Uddingston have been identified for investment.
The work is being delivered by our commercial subsidiary, Scottish Water Horizons, and contactor, Mackenzie Construction.
At a Glance
- £8.6 million investment
- Replacing over 650 metres of pipework
- Six locations across Glasgow and Lanarkshire
-
Supporting future development of University Hospital Monklands
-
Delivered by Mackenzie Construction
What We Are Doing
Six locations across Airdrie, Coatbridge, Bargeddie and Uddingston have been identified for investment. The works will increase capacity within the existing sewer network through the installation of new sewer storage pipes and manholes, helping the system cope more effectively during periods of heavy rainfall.
The project is being delivered in six separate construction elements, with each location progressing to its own programme. A summary of the current status of each element is provided below.
Each element and its location:
-
Element 1 - Craigens Road, Airdrie
-
Element 2 - St. David's Drive, Airdrie
-
Element 3 - Ross Drive, Airdrie
-
Element 4 - Stobcross Street, Coatbridge
-
Element 5 - behind M8 motorway, near Bredisholm Road
-
Element 6 - Calderbraes Golf Club, Uddington
The construction activity will largely take place in grassland, woodland, private land and golf course locations, with work areas generally situated away from public roads. As a result, no traffic management measures are anticipated.
In advance of construction, some tree clearance works will take place where required. These activities have been carefully planned, with environmental surveys undertaken in advance, and compensatory planting to be carried out as part of the project.
The surveys included tree aerial inspections for bats and their roosts and arboricultural surveys to assess any potential risks and determine tree management strategies.
Further information on each work location, including maps, timelines, and site-specific details, is available through the links at the bottom of this page.
Multiple Locations
The project will upgrade the sewer network at six locations (Map data ©2025 Google)
Why We Are Doing It
NHS Lanarkshire is to build a new state-of-the-art replacement for University Hospital Monklands on a site at Wester Moffat in Airdrie. To support the new hospital, the surrounding sewer network requires upgrading.