page banner saying Draining the Rain which denotes this is an Improving Urban Waters project
project status complete

Project Overview

We have completed work to upgrade the waste water network in the Raploch area of Stirling to help manage heavy rainfall, protect the community from flooding and improve the water environment.

This work was part of our £500m Improving Urban Waters programme.

Two projects, totalling £6.2m, at Woodside Road and Laurencecroft Road.

At a glance

  • To prevent sewer debris entering the Firth of Forth
  • £6.2million total investment
  • Delivered by Caledonia Water Alliance 
  • Work completed in September 2026

IUW Stirling

Raploch - Stirling

The projects in the Raploch area will help to reduce the chance of sewer related debris from entering the River Forth

What We Are Doing

We are replacing existing storm overflows and upsizing the associated sewer pipework and manhole chambers at both Woodside Road and Laurencecroft Road in Stirling.

  • Work at Woodside Road began in October 2025, and was completed in August 2026. A section of footpath at Woodside Road was closed during the works with a signed diversion in place.
  • Work at Laurencecroft Road began in January 2026, and was completed in September 2026. A section of the cycle path route was closed with a signed diversion in place.

Our site compound was located in between the two streets at Ochil Crescent for the duration of the works.

IUW Stirling

The Laurencecroft Road site was next to Stirling Old Bridge

IUW Stirling

Work began on Woodside Road in October 2025

Why We Are Doing It

Working closely with the Scottish Environment Protection Agency (SEPA) Scottish Water identified priority storm overflows for improvement or replacement.

Under the banner ‘Draining the Rain, Enhancing the Environment’ the Improving Urban Waters investment will help reduce spills and prevent sewage related debris such as wet wipes from entering the environment during periods of rainfall.

IUW Stirling

IUW Stirling

Latest Update - September 2026

We have now completed work on installing the new storm overflows and all the associated sewer pipework at both Woodside Road and Laurencecroft Road.

All footpaths and cycle paths have now been reopened.

We would like to thank the local community for their patience and understanding while we completed this essential work to upgrade the local sewer network.

IUW Stirling

Woodside Road

The new storm overflow chamber being installed